A space, an installation and a process repository
for the production of a single land-vehicle unit.
It is a hub format production facility, as opposed to an assembly line.
It can be operated from a large sized repair garage.
It consists of the tooling necessary for the production of
a single land-vehicle unit.
A single unit can be produced in an estimated 2 days.
16hrs vs 15 minutes or 64:1 slower than an assembly line.
It can also be used for maintenance and repair of a produced unit.
It is a (significantly) lower-cost alternative
to assembly-line production.
We have started prototyping a Unit-Construction-Hub
for the production of a bicycle-stabiliser.